Entries in balk (1)

Wednesday
Jul132011

roscoe day 5

 

By this point we had completed everything in the script except for three scenes. It looked to be a long, complicated day of exteriors, followed by four or five hours in a studio where I'd never worked before. Realizing that there was a good chance of not being able to finish on what was scheduled to be our final day before the camera, the producer in me decided to change locations to somewhere eminently more manageable: our back yard.

The scene in which the Professor balks at going any farther went from getting his coat snagged on a branch to jumping through some tall grass across a hidden trickle of water. A better solution, and much simpler to execute, was to use the small channel on our side yard. It's one of my favorite locations anyway, and have been photographing it off and on for the past four months.

This compromise was an improvement I feel good about. The scene was completed with no wasted time or undue effort, no need to drive to another location, and set up multiple times in an inaccessible field. The equipment then got transfered to a new location a minute away and 100 feet from the back door of the house. As I was considering where to set the camera again, the precipitation that had held off so far began. We moved everything to the breezeway and waited. Ralph and I have been through this waiting game many times before, so this was nothing unusual. After 30 or 40 minutes of steady rain, and checking with everyone present that they could return the following morning, I cancelled our afternoon schedule. It's still a wrenching call to make, especially since I knew the rain would probably cease within an hour.

Which of course it did. But by then everyone was long gone. It would have been too long a wait to ask everyone to sit through. Instead it gave Craig and me some time to search for props and pick up the wheel chair for our evening interior.